Transport Canada approved activities for Aerospace Welding division

DCM Group Inc./Groupe DCM Inc Division Aerospace Welding is approved for the following categories/ratings under Transport Canada CAR 573-AMO:

  • Arc Welding Per AWS D17.1/D17.1M,
    Including Gas Tungsten Arc Welding (GTAW), Shielded Metal Arc Welding (SMAW), Gas Metal Arc Welding (GMAW) and other general arc techniques
  • Gas Welding Per AWS D17.1/D17.1M
    Including Oxyfuel Welding (OFW)
  • Torch brazing and soldering Per AWS C3.4M/C3.4
  • Resistance Welding Per AWS D17.2/D17.2M,
    Including spot and seam welding.
  • Sheet Metal Structures
  • Tubular Structures
  • NON-DESTRUCTIVE TESTING Per ASTME1417/E1417M
    Liquid Penetrant Inspection (LPI)
  • COMPONENT
    Aircraft Parts/Components As described on AMO capability listing FRM-QMP-07.2

DCM Group Inc./Groupe DCM Inc. division Aerospace Welding is a TCCA-approved organization for manufacturing and certification of Aeronautical Products for the following products, in accordance with CAR 561:

  1. STC 90-30-Issue 2 – Scope- Manufacture and installation of exhaust stack Supports in accordance with Modification Data Summary 903720
  2. STC 91-31-Issue 2 – Scope- Cowling Attachment Fitting Manufacture and Installation.
    Installation of cowling attachment fittings in accordance with Modification Data Summary No. 903600
  3. STC SAP-02-1 Issue 3 -Scope- APU Inlet Screens
    Manufacture of APU Inlet Screens in accordance with Master Data List – Honeywell Model 36-150 (RJ) APU Compressor Inlet Screen modification; MDL-15R2-001

All other activities and processes at the four (4) divisions of DCM Group Inc are not performed under the authority of Transport Canada.